Dezembro 17, 2019
After the creation of the Interpretative Center of Jamor, the opening had its first exhibition with the theme “National Stadium: from dream to realization”. This temporary exhibition is a storytelling of the process that involved the construction of the National Stadium – an iconic monument – from the beginning of the 30’s until the date of its inauguration, on June 10, 1944.
In addition to the overall design, US was also responsible for the selection of structures and materials, with the aim to ensure the right conditions to accommodate and adapt other exhibitions.
>> See here << General Space Conversion Design Project
>> See here << Interpretative Center Project
>> See here << Cafeteria ‘Até Jámor’ Project
>> See here << “Generations Space” Project
Project Direction:
Instituto Português do Desporto e Juventude
Museu Nacional do Desporto
Client:
Instituto Português do Desporto e Juventude
Concept and Global Design:
Ivone Machado // US • United Skills
Production and Assembly:
UNVEIL
Local: Complexo de Piscinas do Jamor
Press:
Associação dos Jornalistas do Desporto (CNID)
Jamor
IPDJ